{"id":749,"date":"2010-07-21T16:46:54","date_gmt":"2010-07-21T23:46:54","guid":{"rendered":"http:\/\/spidertie.com\/?p=749"},"modified":"2010-07-21T16:46:54","modified_gmt":"2010-07-21T23:46:54","slug":"footing-and-wall","status":"publish","type":"post","link":"https:\/\/spidertiesystem.com\/footing-and-wall\/","title":{"rendered":"Monolithic Footing and Wall"},"content":{"rendered":"

Pouring the footing and wall at the same time saves time and money. By incorporating both the “Fast Foot”<\/strong> footing system and the “Spider Tie”<\/strong> wall system together makes this possible. Innovation and change is vital in surviving the present economy. This combination provides an advantage over the competition. No leveling or finishing of the footing required. Everyone knows a monolithic footing and wall has many advantages and is much stronger. Engineering is available. Both systems are a natural fit and very easy to use. Here are list of advantages:<\/p>\n